Collaborations

twitter linkedin youtube facebook 0


Overall View of Pilot Unit

The diagrams below depict the following equipment:

Located on the ground:

  • Cooling Tower (blue)
  • Quench Tower (shortest tower)
  • Absorption Column (medium-size tower)
  • Stripping Column (tallest tower)
  • Water and Solvent Tanks (green tanks)

Located on the scaffolds:

  • Heat exchangers (orange cylinders)
  • Vacuum Pump (blue)
  • Direct Contact Gas Condenser (dark green cylinder)

Front View

 

Back View

Right Side View

 

Left Side View

Top View

Photographs of the progress in the construction of the pilot